  1. 1. Habitat for Humanity: Habitat for Humanity Project Begins

    1999-09-06

    Plans are under way to build a house in one week with a team of Habitat for Humanity volunteers in Yonkers, NY. Included: a tour of Yonkers and of a Habitat community in Phoenix.

  2. 2. Habitat for Humanity: Framing the Walls

    1999-09-13

    The walls go up at the Roxbury project, and Bob Vila tours a manufacturing facility where special structural insulated panels (SIPs) are made. Also: a look at a money-saving system for recapturing heat from drain water.

  3. 3. Habitat for Humanity: Working On the Roof

    1999-09-20

    Roof framing begins and the giant ridge beam is raised. Also: a tour of the Oregon plant where I-joists are made.

  4. 4. Habitat for Humanity: Exterior Trim and Porch Ceiling

    1999-09-27

    Exterior trim work continues, while overlaid plywood is installed on the porch ceiling by a team of volunteers and celebrities. Included: tour of a plywood mill in Washington.

  5. 5. Habitat for Humanity: Sheathing and Shingling the Roof

    1999-10-04

    Roofing work continues with the installation of photovoltaic shingles that convert solar energy into electricity. Also: a tour of the Global Solar Plant in Arizona.

  6. 6. Habitat for Humanity: Siding and Drywall

    1999-10-11

    A special siding goes up, and drywall with pre-finished corners is installed in record time.

  7. 7. Habitat for Humanity: Building the Back Porch

    1999-10-18

    The back porch is built with help from some high school tech students, and the trim gets finishing touches.

  8. 8. Habitat for Humanity: Painting and Door Installation

    1999-10-25

    Bob Vila explains door installation, while indoor and outdoor painting gets underway at the project house.

  9. 9. Habitat for Humanity: Floor Installation

    1999-11-01

    An entertainment center, flooring, and loft shelves are installed.

  10. 10. Habitat for Humanity: Working On the Kitchen

    1999-11-08

    Cabinets and counter tops are installed in the kitchen, and money saving energy efficient appliances are discussed.

  11. 11. Habitat for Humanity: Carpet and Bathroom Fixtures

    1999-11-15

    Carpet is laid in a bedroom and high efficiency fixtures are installed in the bathroom.

  12. 12. Habitat for Humanity: Interior Design

    1999-11-22

    Guest B. Smith applies a colorful wainscot pattern along the wall of the children's bedroom.

  13. 13. Habitat for Humanity: House Tour

  14. 14. Executive Mansion: Governor's Mansion Tour

    1999-12-06

    Bob Vila and crew take on restoring the Virginia governor's Federal style mansion, built in 1813.

  15. 15. Executive Mansion: Restoring the Floor

    1999-12-13

    Floor restoration is underway with an acrylic injection technique.

  16. 16. Executive Mansion: Preparing to Pour a Concrete Floor

    1999-12-20

    Preparations are made to pour a concrete floor in the basement, utilizing an elaborate concrete pump system.

  17. 17. Executive Mansion: Removing Windows for Restoration

    1999-12-27

    Paint is removed from the masonry garden walls and windows are taken down for restoration.

  18. 18. Executive Mansion: Framing New Walls

    2000-01-03

    Framing and trim work are underway in the basement, which is being transformed to include a state-of-the-art kitchen, wine cellar, and laundry.

  19. 19. Executive Mansion: Installing a Dumbwaiter

    2000-01-10

    A dumbwaiter is installed to connect the basement kitchen with the first-floor dining room.

  20. 20. Executive Mansion: Installing Baseboards

    2000-01-17

    Baseboard is installed on the second floor to accommodate updated HVAC and electrical systems.

  21. 21. Executive Mansion: Basement Kitchen

    2000-01-24

    Preparations are made in the basement kitchen for state-of-the-art foodservice equipment and appliances.

  22. 22. Executive Mansion: Mantelpiece Restoration

    2000-01-31

    The mantelpieces are preserved in order to restore historic features to the mansion.

  23. 23. Executive Mansion: Technology Systems Tested

    2000-02-07

    Landscaping, masonry work, and painting are done on the mansion's exterior.

  24. 24. Executive Mansion: Finishing the Kitchen

    2000-02-14

    A small kitchen in the governor's private quarters is finished and carpet is put down in the bedrooms.

  25. 25. Executive Mansion: Interior Decorating

    2000-02-21

    The mansion gets elaborate interior decor.

  26. 26. Executive Mansion: Mansion Final Tour